My thanks to the Gullixson Realty Group for posting this YouTube Video.
This Smart Home project was both difficult and rewarding. Lasting about two years, it was a major undertaking. Since the build was mostly concrete, wires and cables had to be run inside conduits which were embedded into the concrete forms. No room for error, as all conduits had only a limited space, and all conduits were completely full. In this job, we had…
Dedicated Home Theater with 12′ Acoustically-Transparent Video Screen, JVC 4K Projector, Acoustic Paneling over embedded Speakers
Distributed 4K video Throughout
Control4 Panelized Lighting
Security System
Entry System with Communication
HVAC and Radiant Heat
Pool & Spa Control
Feel free to leave comments…
Great Project!